Candidates Form

 Candidate Analysis For Production Lift

 

Company:
Date:
Company Representative:
Phone:
Lease/Well No.
Field/Location:

Production Method:  

Flowing:
Beam Pump: Gas Lift: Plunger Lift:
 
Depth Of Well:
Formation Being Produced:

Multiple Completion:
Yes
No  

 

Tapered Tubing String:

Yes
No
 
Production Tubing (Dia. in Inches):


 
 Wt.
#/ft.
Tubing Stop Or Seating Nipple:

Yes
No 
 
Depth:
ft.
Standing Valve In Tubing:

Yes
No  
 
Depth:
 ft.
Packer In Hole: 

Yes
 No   
 
Depth
 ft.
Master Valve Full Opening: 

Yes
  No
 
Casing Size: 
in.
Perforation Intervals:


 
Gas Sales Line Pressure: 
psi.
Gas Sales Line Pressure: 

psi.
 
Length Of Flowline:
ft.
Separator Pressure:

1st 
psi.
 

2nd
psi.
Tubing Pressure: 

Producing
psi.
 

Shut-In:
psi.
Casing Pressure: 
Producing
psi.
 

Shut-In:
 
psi.
Shut-In Bottom Hole Pressure: 

psi.
 
Producing Bottom Hole Pressure:

psi.
 
Static Fluid Levels: 

Tubing:
ft.
 

Casing:
ft.
Daily (24Hr)Production Rates:   

Oil/Condensate:
BBL
 
Gas: 

MCF
 
Water: 
BBL
Productivity Index:

BBL/DAY/PSI
 
Oil Gravity: 
API
Gas Gravity:


 
Paraffin Problems: 

Yes
 No

 

© 2008 All right reserved | Production Lift Systems, Inc.    1-800-594-3887